节点文献
大秦线施工天窗及通过能力的研究
Study on Maintenance Skylight and Carrying Capacity of Da-Qin Line
【摘要】 通过计算机铺画大秦线最大货物列车运行图,研究了适用于大秦线设备条件的“综合V型天窗”的设计、比选与优化问题,并根据大秦线近期、中期与远期运量的需要,分别提出了各个时期的维修天窗方案及相应的有关设备配套措施。
【Abstract】 Based on drawing maximum freight train diagram by computer, this paper studies design, comparison and optimization of comprehensive V-shaped skylight suitable for equipment conditions of Da-Qin line. According to demands of short-term, middle-term and long-term traffic of Da-Qin line, this paper advances respectively maintenance skylight alternatives of every term and measures of corresponding relative equipment series.
【关键词】 施工天窗;
列车运行图;
通过能力;
输送能力;
【Key words】 ss: maintenance skylight; train diagram; carrying capacity; conveying;
【Key words】 ss: maintenance skylight; train diagram; carrying capacity; conveying;
- 【文献出处】 北方交通大学学报 ,JOURNAL OF NORTHERN JIAOTONG UNIVERSITY , 编辑部邮箱 ,1994年04期
- 【分类号】U292.41
- 【被引频次】14
- 【下载频次】206