HTR-10燃料元件装卸系统冷态调试
Verification of HTR-10Fuel Handling System in Cool State
【摘要】 10MW高温气冷实验堆(HTR-10)是一座球床堆,由燃料元件装卸系统实现燃料元件的装卸和循环,且不需要停堆。为保证HTR-10的正常运行,燃料元件装卸系统必须安全、可靠。为此,必须对燃料元件装卸系统进行周密、细致的调试试验和验证。本文介绍了燃料元件装卸系统冷态调试的主要调试项目、调试方法和调试结果。
【Abstract】 10MW High Temperature Gas-cooled Reactor(HTR-10)is a pebble-bed of reactor.The fuel handling system automatically performs the handling and cycle of the fuel elements.It isn’t neces-sary to shut down the reactor for the handling and cycle of the fuel elements.In order to ensure the HTR-10run normally,the fuel handling system must work safely and reliably.Therefore,the fuel han-dling system must be verified carefully in cool state.This paper introduces the main projects,the methods and the results of the verification.
【关键词】 高温气冷堆;
燃料元件装卸系统;
冷态调试;
【Key words】 High temperature gas-cooled reactor; Fuel elements handling system; Verification in cool state;
【Key words】 High temperature gas-cooled reactor; Fuel elements handling system; Verification in cool state;
【基金】 国家“863”计划能源重点项目
- 【文献出处】 核动力工程 ,Nuclear Power Engineering , 编辑部邮箱 ,2002年01期
- 【分类号】TL374
- 【被引频次】7
- 【下载频次】133