With the scheme of prcfabrication and settlement of the 35m simple - ringe beams chosen, the quality of the beams and settlement procedure are strictly controlled, the beams spanning over railway can successfully be settled and the construction cost can be cut down. This paper is a good kind of reference to researching、instructing and constructing in situ.