According to the construction subsequence of zero cable saddle pre-bias suspension bridge, the main content of construction control and monitor are analyzed and applied to Lancangjiang suspension bridge. To settle the curve shape of cable during the construction of basic cable fitting, analysis iteration method based on cable mechanics is introduced in this paper, and efficiency method about adjusting the curve shape of basic cable is established.Utilizing the gray system theory, this paper amend the temper...