This paper introduces the theory and process of the configuration calculation of main cable for self-anchored suspension bridge based on the methods of segmental catenary and parabola,put forwards a nonlinear programming method for the iterative calculation by considering the flexural effect on the axial rigidity of the beam,and verifies the accordance of the proposed method with the traditional influence matrix method.It is demonstrated by the calculated results of self-anchored suspension bridge with typi...