The general development situation of UHV AC power transmission abroad and its applicable scope are introduced. The authors point out that to meet the requirement of the fast development of electric power industry in China, the UHV AC power transmission should be built to transmit the electric energy generated by the large scale hydroelectric power stations and thermal power plants that will be built in West China to East China as well as to transmit the electric energy generated by the large scale thermal p...