When the power machines of wind-tunnel work such as alternating-current machine governor and direct-current machine governor and relay, they will bring about strong interference.The interference go into the test system through electrified wire netting,signal wire and ground wire.We take measure for inhibition interference by power supply system and signal wire and ground wire etc.Using digital filter in software through isolate,screen,filter and ground connection etc.