<正> Since the last International Union of Geodesy and Geophysics (IUGG) General Assembly (1999), the predictability studies in China have made further progress during the period of 1999-2002. Firstly, three predictability sub-problems in numerical weather and climate prediction are classified, which are concerned with the maximum predictability time, the maximum prediction error, and the maximum allowable initial error, and then they are reduced into three nonlinear optimization problems. Secondly, the conc...
【英文摘要】
Since the last International Union of Geodesy and Geophysics (IUGG) General Assembly (1999), the predictability studies in China have made further progress during the period of 1999-2002. Firstly, three predictability sub-problems in numerical weather and climate prediction are classified, which are concerned with the maximum predictability time, the maximum prediction error, and the maximum allowable initial error, and then they are reduced into three nonlinear optimization problems. Secondly, the concepts...
【更新日期】
2005-08-19
【分类号】
P456
【正文快照】
1 .Introduetion Predietability 15 a fuxldamental issue in both atm于sPherie and oeeanie researeh and numerieal weatherand elimate predietions.The terminology“Pre-dietability,,15 used extensively in the literature.How-ever,in this review PaPer it 15 under