The transformative plan of the 300×103m3/d light hydrocarbon recovery unit at Zhongba is introduced. Owing to the increase of feed gas in recent years, handling ability of original unit can not satisfy productive requirement. Analysis of now available equipment, above all the expansion turbine has been altered. The result is obvious and can obtain considerable economic benefit. And this article puts forward some directions of the deep processing.