Theoretical analysis and experiment on Accumulative Drop Unit (ADU) have been made to determine its parameters and optimal structure. The performance tests of ADU have showed that performance of ADU presented in this paper is satisfactory and present problems of such unit are solved. Especially, the side-open conic duckbill mounted on the unit effectively presents the soil blocking up problem. Therefore, the unit is a kind of updated working