The period from November to February next year is the fitting and propertime for the cold resistance test in the Yangtze estuary.It was found that thepercentage of electrolytes in the leakage from one-year shoots of various culti-vated varieties or stocks tallied with the cold resistance of them.The damagedrate most conveniently measured is as follows:(?)