With the development of a scroll compressor, inverter compressor, vapor-injection compressor, etc. high-efficiency compressors emerged. Which required new compressor test method. This paper conducted a compressor test study, and proposed optimization plan for compressor test bench.
This test bench main cycle using the second refrigerant calorimeter method. Secondary cycle using the liquid flow meter method. The bench following ISO917, EN13771-1, GB-T5773. Based on that, with following methods to optimiz...