The time-cost optimization is one of the most crucial aspects of construction project planning, it belong to multi-objective optimization problem. Multi - objective optimization is a difficult problem and a research focus in the fields of engineering. Classical Multi-objective optimization methods have several shortcomings in solving high dimension and multi-model problems. Many problems which often depend on the mathematical characteristics of the objective functions can not be solved satisfactorily by the...