节点文献

Heating and melting mechanism of stainless steelmaking dust pellet in liquid slag

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 彭及唐谟堂彭兵余笛J. A. KOZINSKI唐朝波

【Author】 PENG Ji TANG Mo-tang, PENG Bing, YU Di, J. A. KOZINSKI3, TAN G Chao-bo (1. School of Metallurgical Science and Engineering, Central South University, Changsha 410083, China; 2. School of Information Science and Engineering, Central South University, Changsha 410083, China; 3. Department of Metallurgical Engineering, McGill University, 3610 University Street, Montreal, H3A 2B2, Canada)

【机构】 School of Metallurgical Science and Engineering Central South UniversitySchool of Metallurgical Science and EngineeringCentral South UniversitySchool of Information Science and EngineeringDepartment of Metallurgical EngineeringMcGill University3610 University StreetMontrealH3A 2B2CanadaChangsha 410083China

【摘要】 The heating and melting mechanisms of the pellets immersed in liquid slag were investigated, and the effect of the pellet heating and the melting conditions were studied. The results show that the dust component in the pellet is melted from the surface and no metallic elements are melted before the dust component, the time for the pellet completely melted is reduced as the iron powder content increases since the metallic iron has high thermal conductivity. These are four stages of heating and melting of pellet in liquid slag, they are the growth and melt of solid slag shell, penetration of liquid slag, dissolving of dust component and melting of reduced metals. The lifetime of the solid slag shell is in the range of 7-16 s and increasing the pre-heating temperature of the pellet and the slag temperature can shorten the slag shell lifetime. The time for the dust component in the pellet to be melted completely is in the range of 20-45 s and increasing the pre-heating temperature, especially in the range of 600-800 ℃, can obviously reduce the melting time. A higher slag temperature can also improve the pellet melting and the melting time is reduced by 10-15 s when the slag temperature is increased from 1 450 to 1 550 ℃. The pellet with higher content of iron powder is beneficial to the melting by improving the heat conductivity.

【Abstract】 The heating and melting mechanisms of the pellets immersed in liquid slag were investigated, and the effect of the pellet heating and the melting conditions were studied. The results show that the dust component in the pellet is melted from the surface and no metallic elements are melted before the dust component, the time for the pellet completely melted is reduced as the iron powder content increases since the metallic iron has high thermal conductivity. These are four stages of heating and melting of pellet in liquid slag, they are the growth and melt of solid slag shell, penetration of liquid slag, dissolving of dust component and melting of reduced metals. The lifetime of the solid slag shell is in the range of 7-16 s and increasing the pre-heating temperature of the pellet and the slag temperature can shorten the slag shell lifetime. The time for the dust component in the pellet to be melted completely is in the range of 20-45 s and increasing the pre-heating temperature, especially in the range of 600-800 ℃, can obviously reduce the melting time. A higher slag temperature can also improve the pellet melting and the melting time is reduced by 10-15 s when the slag temperature is increased from 1 450 to 1 550 ℃. The pellet with higher content of iron powder is beneficial to the melting by improving the heat conductivity.

【基金】 Project(50274073) supported by the National Natural Science Foundation of China; project(Metallurgy 2003, CRDPJ 210038) supported by Natural Sciences and Engineering Research Council of Canada
  • 【文献出处】 Journal of Central South University of Technology ,中南工业大学学报(英文版) , 编辑部邮箱 ,2007年01期
  • 【分类号】O482
  • 【下载频次】63
节点文献中: 

本文链接的文献网络图示:

本文的引文网络