节点文献
公路桥梁嵌岩桩嵌岩深度计算
Calculation Methods for Socketed Length of Rock-socketed Pile
【摘要】 本文深入探讨了嵌岩桩的荷载传递机理,对目前规范采用的嵌岩桩嵌岩深度计算方法进行了深入分析,针对规范方法没有考虑桩身转动时桩尖断面与基底岩接触面上产生的反力矩等有利条件的影响而导致最后的计算结果偏大的不足,提出了两种修正方法。最后还通过具体计算实例进行了分析验证。
【Abstract】 Loading transfer mechanism of rock-socketed pile is discussed.Then,calculation methods mentioned in the technical codes are analyzed.The insufficient is that the code methods doesn’t consider some useful effects,such as the moment on pile tip formed by pile rolling motion.Two modified calculation methods are proposed to make up this insufficient.Finally,an examples is employed to validate the method proposed in this paper.The calculation results show that the method is much feasibility.
【关键词】 嵌岩桩;
荷载传递机理;
嵌岩深度;
【Key words】 rock-socketed pile; loading transfer mechanism; socketed length;
【Key words】 rock-socketed pile; loading transfer mechanism; socketed length;
【基金】 国家自然科学基金资助项目(50378036)
- 【文献出处】 中南公路工程 ,Journal of Central South Highway Engineering , 编辑部邮箱 ,2007年01期
- 【分类号】U443.15
- 【被引频次】22
- 【下载频次】415