节点文献

大跨度连续刚构桥预应力箱梁体外索加固施工

Strengthening Construction of External Cable to Prestressed Box Girder of Large-span Continuous Rigid Framework Bridge

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 兰建雄崔佰民

【Author】 LAN Jian-xiong1,CUI Bai-min2(1.Guangdong Changda Highway Projects Co.,Ltd.,Guangzhou 510620,China;2.Hei Longjiang Expressways Construction Bureau,Ha’erbin 150040,China)

【机构】 广东省长大公路工程有限公司黑龙江省高速公路建设局 广东广州510620黑龙江哈尔滨150040

【摘要】 针对某大跨度连续刚构桥出现的主要病害及其原因,介绍了采取增设预应力混凝土箱梁体外索的加固措施。具体阐述了设置剪力槽、种植锚筋、浇筑齿板混凝土、体外索制作与安装、体外索张拉等施工技术。

【Abstract】 Aiming at the main damage and its causes of a large-span continuous rigid framework bridge,the strengthening measure of adding the external cable to prestressed concrete box girder was introduced.The construction techniques were put forward in detail including installing shearing force tank,planting anchor bar,casting toothed plate concrete,the manufacture,the installment and the tension of the external cable,etc.

  • 【文献出处】 中国市政工程 ,China Municipal Engineering , 编辑部邮箱 ,2007年03期
  • 【分类号】U445.72
  • 【被引频次】3
  • 【下载频次】83
节点文献中: 

本文链接的文献网络图示:

本文的引文网络