节点文献

混凝土静动力学分析数值模拟程序中的并行算法设计

Application of parallel computing technique in programming of numerical simulation for concrete under static-dynamic load

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 朱星明吴建平马怀发涂彬

【Author】 ZHU Xing-ming~1,WU Jian-ping~2,MA Huai-fa~1,TU Bin~1(1.China Institute of Water Resources and Hydropower Research,Beijing 100044,China;2.National Key Laboratory for Parallel and Distributed Processing,Changsha 410073,China)

【机构】 中国水利水电科学研究院信息网络中心国防科技大学计算机学院中国水利水电科学研究院工程抗震研究中心中国水利水电科学研究院信息网络中心 北京100044湖南长沙410073北京100044

【摘要】 对混凝土进行静动力学分析的数值模拟程序,从多个方面考虑了其中的并行算法设计。首先,从整体上提出了一个将有限单元分布与未知量分布有机结合的整体并行算法设计方案。之后,分别针对刚度矩阵装配、双门槛不完全Cholesky分解预条件、稀疏矩阵与向量相乘、稀疏向量相加等核心算法,提出了相应的高效并行算法。在由8台奔腾4微机组成的机群上对一采用44117个网格点与53200个有限单元的混凝土断裂过程数值模拟表明,加速比可以达到6.92,与单机算法改进效果相结合后,一次加载的计算时间从原程序的11443s减少到了13s。在有4个CPU的一台Sun HPC上对采用71013个网格点与78800个有限单元的问题进行数值模拟时,串行算法改进与并行算法的设计也使得整个过程所需的计算时间从原串行程序的约15d减少到只要122min。

【Abstract】 The parallel computing technique is applied to design the programming for numerical simulating the fracture and damage of concrete under static-dynamic load.First,the overall framework for the parallel computation of the combination of finite element distribution with unknown quantity distribution is established.The whole computation is based on FEM.Consequently,the high efficiency parallel computation is realized by introducing the assembly process of the stiff matrix,incomplete Cholesky factorization with double threshold,multiplication of a sparse matrix with a vector and two sparse vectors.By means of this technique the computation speed on a cluster with 8 Pentium 4 personal computers for simulating the fracture process of a concrete block with 441117 grids and 53200 elements is accelerated by 6.92 times.Comparing with the original computation method the time spent to simulate the one step of loading reduced from 11443 sec.To 13 sec.On a Sun workstation with 4 processors,the computation for simulating the fracture of a concrete block with 71013 discrete points and 78800 finite elements the computation time consumption is reduced from 15d.to 2hr.The advantage of parallel computing technique is remarkable.

【基金】 水利部“948”引进项目(200414)
  • 【文献出处】 水利学报 ,Journal of Hydraulic Engineering , 编辑部邮箱 ,2007年04期
  • 【分类号】TV431
  • 【被引频次】2
  • 【下载频次】188
节点文献中: 

本文链接的文献网络图示:

本文的引文网络