节点文献

锦屏一级高拱坝温度场和应力场仿真分析

Temperature Field and Stress Field Simulation Analysis for Jinping-1 High Arch Dam

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 强晟朱岳明吴世勇陈樊建张杨

【Author】 QIANG Sheng ZHU Yueming WU Shiyong CHEN Fanjian ZHANG Yang(College of Water Conservancy and Hydroelectric Eng.,Hohai Univ.,Nanjing 210098,China)

【机构】 河海大学水利水电工程学院河海大学水利水电工程学院 江苏南京210098江苏南京210098

【摘要】 为了高拱坝的安全施工和运行采用有限元法模拟了锦屏一级工程混凝土拱坝的整体施工过程和30 a运行过程,结果揭示了300 m级高拱坝的温度历时变化过程、坝体准稳定温度场及应力场分布规律,对设计和施工具有重要的参考价值。

【Abstract】 For the safe construction and operation of high arch dam,the concrete arch dam construction and operation procedure during 30 years in Jinping-1 engineering is simulated by finite element method.The results show the temperature duration,the distribution patterns of quasi steady temperature field and stress field of 300m grade high arch dam.Important reference is provided to designing and construction in the aspect of temperature control and cracking prevention.

【基金】 国家自然科学基金重点资助项目(50579080)
  • 【文献出处】 水电能源科学 ,Water Resources and Power , 编辑部邮箱 ,2007年02期
  • 【分类号】TV642.4;TV315
  • 【被引频次】30
  • 【下载频次】423
节点文献中: 

本文链接的文献网络图示:

本文的引文网络