节点文献

宝珠寺水电站枢纽布置及重点技术问题

Layout and key technical issues of Baozhusi hydropower station

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 安盛勋孙保平

【Author】 AN Sheng-xun,SUN Bao-ping(Northwest Hydro Consulting Engineers,CHECC,Xi’an 710065,China)

【机构】 中国水电顾问集团西北勘测设计研究院中国水电顾问集团西北勘测设计研究院 西安710065西安710065

【摘要】 宝珠寺水电站工程为白龙江干流上已建的最大梯级电站,为一等大(1)型工程。于2000年竣工验收。文章重点介绍在拦河坝优化设计中采取技术的措施,并着重对厂坝联合作用方案进行介绍。坝址区河谷狭窄,洪水峰高量大,通过试验研究对泄洪建筑物布置方案进行优化;并介绍左岸挡水坝段基础深层抗滑稳定采用混凝土置换洞塞处理方案。

【Abstract】 Baozhusi project(Grade I) is the largest cascade hydropower station completed on Bailongjiang River,and was finally accepted in the year 2000.The paper mainly introduces technical measures adopted in optimum design of the dam,together with combined-action schemes of dam and powerhouse.At damsite area,the valley is narrow with high peak flood,and thus the layout of flood releasing structures is optimized by tests.The stability against sliding for deep foundation of left-bank dam was achieved by applying concrete plug.

  • 【文献出处】 西北水电 ,Northwest Hydropower , 编辑部邮箱 ,2007年01期
  • 【分类号】TV61
  • 【被引频次】3
  • 【下载频次】119
节点文献中: 

本文链接的文献网络图示:

本文的引文网络