节点文献
复杂地质条件下承台围堰钢板桩的计算
Under the Complex Geology Receives to Bearing Platform Cofferdam Steel Sheet Pile Computation
【摘要】 本文通过对复杂的地质条件下承台钢板桩围堰的施工中,典型工程实例的钢板桩围堰支护设计、计算以及钢板桩支护体系稳定性的验算,提供一种在复杂地质条件下围堰施工的简单计算方法,为类似工程施工提供参考
【Abstract】 This text passes to under complicated geology condition accept set steel plate a stake round an embankment of under construction, the introduction which round an embankment to protect design and the calculation engineering solid example of the steel plate stake of typical model, provide a sow in under complicated geology condition round an embankment construction of simple calculation method, for similar the engineering construction provide a reference.
【关键词】 复杂地质;
钢板桩;
支护设计;
稳定性验算;
【Key words】 complex geological; steel sheet pile; the supports and protections designs; stable checking calculation;
【Key words】 complex geological; steel sheet pile; the supports and protections designs; stable checking calculation;
- 【文献出处】 广州建筑 ,Guangzhou Architecture , 编辑部邮箱 ,2007年02期
- 【分类号】U443.2
- 【下载频次】108