水电站厂内短期经济运行系统的设计与实现
Design and Realization of an In-plant Short-term Economical Operation System for Hydropower Stations
【摘要】 随着中国电力体制改革的推进,发电企业成了竞争的主体,水电站实施厂内经济运行显得尤为重要。文中探讨了在电力市场环境下如何将全厂的日发电计划最优地分配到各台机组,建立了以发电耗流量最小为目标的数学模型,设计并开发了基于B/S模式的水电站厂内经济运行的优化计算系统,并以乌江渡水电站某日发电计划进行实例分析,验证了系统的合理性和实时性。
【Abstract】 With the advance of the electric power system reform in China, power plants have become the principal part in the competition. For this reason, the realization of in-plant economical operation is very important for hydropower stations. This paper discusses the optimal daily generation load distribution over each unit under the electricity market environment, formulates a model whose objective function is the minimum of water consumption of power generation, designs and develops an in-plant economical operation optimization system for hydropower stations based on the B/S mode. The rationality and real-timeliness of the system are verified by a generation schedule of the Wujiangdu Hydropower Station.
【Key words】 hydropower station; in-plant economical operation; load distribution; unit combination;
- 【文献出处】 水电自动化与大坝监测 ,Hydropower Automation and Dam Monitoring , 编辑部邮箱 ,2007年01期
- 【分类号】TV737
- 【被引频次】15
- 【下载频次】423