节点文献
具有通用机的n组工件的排序问题
A Type of Scheduling Problem on General-Purpose Machinery and n-Group Tasks
【摘要】 本文讨论了具有n台速度相同的专用机,一台同速度的通用机的n组工件的Cmax问题,提出了改进的LPT算法,得到了近似算法的一个估计.
【Abstract】 In this paper, we discuss the Cmax problem on groups of jobs with one general-purpose machinery and n special-purpose machinery that they are the same speed, an improved LPT algorithm and the upper bound performance are given.
【关键词】 运筹学;
排序;
启发式算法;
性能指标;
多组工件;
通用机与专用机;
【Key words】 Operations research; scheduling; heuristic approach; performance indexes; many groups of jobs; general-purpose and special-purpose machinery;
【Key words】 Operations research; scheduling; heuristic approach; performance indexes; many groups of jobs; general-purpose and special-purpose machinery;
【基金】 国家自然科学基金(10531040);广东省自然科学基金(4009802);香港中山大学高等学术中心资助项目(05M2)
- 【文献出处】 运筹学学报 ,Or Transactions , 编辑部邮箱 ,2006年04期
- 【分类号】O223
- 【被引频次】5
- 【下载频次】94