节点文献

深埋连拱隧道两种中墙的施工力学行为分析

Behavior of two types of intermediate walls during the excavation of a deep multi-arch tunnel

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 时亚昕王明年李强

【Author】 Shi Yaxin Wang Mingnian Li Qiang(School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031)

【机构】 西南交通大学土木工程学院西南交通大学土木工程学院 成都610031成都610031

【摘要】 采用数值方法,对深埋连拱隧道在Ⅱ、Ⅲ、Ⅳ级围岩条件下整体式直中墙、分离式直中墙的施工受力进行分析,得出了中墙的基本受力规律及中墙施工的关键工序和薄弱部位。结果表明,对于Ⅱ级围岩深埋连拱隧道,两种中墙结构只需构造配筋即可满足要求;而对于Ⅲ、Ⅳ级围岩深埋连拱隧道,则需根据内力配置钢筋。

【Abstract】 Adopting numerical method,authors of the paper analyzed the behavior of the single intermediate wall and the separated intermediate walls of a deep multi-arch tunnel when excavated in the rocks of grade Ⅱ,III and Ⅳ respectively.As a result,they found out the crucial construction processes and the weak points for the intermediate walls.As indicated by the analyses,the two types of intermediate walls of a multi-arch tunnel should only be reinforced by construction requirements for rock grade II,but should be reinforced according to internal forces for rocks grade Ⅲ and Ⅳ.

  • 【文献出处】 现代隧道技术 ,Modern Tunnelling Technology , 编辑部邮箱 ,2006年03期
  • 【分类号】U451
  • 【被引频次】10
  • 【下载频次】132
节点文献中: 

本文链接的文献网络图示:

本文的引文网络