节点文献
夯能和夯击次数在西部山区公路填方路堤中的应用
Application of Tamping Energy and Tamping Times Control in the Filled Embankment of Highways in Western Mountainous Regions
【摘要】 文章介绍了强夯法在国内外研究和应用的现状,结合强夯在西部山区填方路堤再压实的试验,分析了夯能和夯击次数对填方路堤沉降量的影响,提出了不同夯能条件下夯击次数的具体取值范围,为今后同类工程的设计和施工提供参考。
【Abstract】 In this article,the author introduces the current research and application state of dynamic compaction at home and abroad,and gives an analysis on how the tamping energy and tamping times affect the settlement of filled embankment based on the forced compaction test of filled embankment in Western Mountainous Regions.It also provides specific value scope of tamping times under different tamping conditions,which gives reference for the design and construction of similar works in the future.
【关键词】 西部公路;
路堤;
填方;
强夯法;
应用;
【Key words】 Highways in Western China; Embankment; Filling; Forced compaction; Application;
【Key words】 Highways in Western China; Embankment; Filling; Forced compaction; Application;
- 【文献出处】 西部交通科技 ,Western China Communications Science & Technology , 编辑部邮箱 ,2006年04期
- 【分类号】U416.12
- 【被引频次】1
- 【下载频次】35