节点文献

国内梯级泵站调水工程运行调度综述

Progress in studies of operation and scheduling of multistage pumping stations in water transfer projects in China

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 杨飞于永海徐辉

【Author】 YANG Fei~1,YU Yong-hai~2,XU Hui~2(1.College of Water Conservancy and Hydropower Engineering,Hohai University,Nanjing 210098,China;2.Department of Modern Agricultural Engineering,Hohai University,Nanjing 210098,China)

【机构】 河海大学水利水电工程学院河海大学现代农业工程系河海大学现代农业工程系 江苏南京210098江苏南京210098

【摘要】 简析调水工程梯级泵站运行时的安全可靠性与经济性问题,综述国内梯级泵站调水工程运行调度研究的进展,并提出了需要进一步研究的问题:①加强梯级泵站调水工程运行调度的计算机仿真研究;②开展提高梯级泵站实时调度自动化水平的研究。

【Abstract】 Some problems about the reliability and practicability of multistage pumping stations in water transfer projects were discussed in detail.A review was made of some progresses in studies of operation and scheduling of multistage pumping stations in water transfer projects in China,and some problems to be further studied were put forward,i.e.to strength the simulation study on operation and scheduling of multistage pumping stations and to improve the automatic level for real-time control.

  • 【文献出处】 水利水电科技进展 ,Advances in Science and Technology of Water Resources , 编辑部邮箱 ,2006年04期
  • 【分类号】TV68
  • 【被引频次】20
  • 【下载频次】448
节点文献中: 

本文链接的文献网络图示:

本文的引文网络