Steel rusting is the main one among the reasons of early period destruction bridge structure alording to study on several early period destruction modals of bridge structure. Lots of factors influence structure crack which is the main reason of steel rusting. Synthesize measures must be carried out to decrease structure crack and promote the durability of the structure.