除尘器整体平移施工技术
CONSTRUCTION TECHNOLOGY FOR INTEGRAL TRANSLATION OF DUST REMOVER
【摘要】 叙述采用整体平移施工技术对鞍山钢铁集团炼铁总厂11号高炉除尘器进行整体平移的全过程,包括准备工作、平移方案、平移施工等,按本文方法仅用时6.5h,平移3.54m,节约资金近180万。
【Abstract】 The full translating process of the dust remover of furnace No.11 of Anshan Steel Mill(Group) by integral translation technology is introduced,inclusive of preparation work,translation plan and construction.By this method it was translated 3.54 m in 6.5 h and save capital 1.8 million RMB.