节点文献

长春环城高速公路桥主梁静载试验

Static Loading Test on the Girder of Changchun City Highway Bridge

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 杨艳敏刘春虹尹国辉

【Author】 YANG Yan-min~1,LIU Chun-hong~2,YIN Guo-hui~3(1:School of Civil Engineering,Jilin Architectural and Civil Engineering Institute,Changchun 130021;2:Nineteenth Bureau,China Railway,Liaoyang 111000;3:The 5th Construction Co.ltd of The 13th Buread Group China Railway,Changchun 130000)

【机构】 吉林建筑工程学院土木工程学院中铁十九局集团中铁十三局集团第五工程有限公司 长春130021辽阳111000长春130000

【摘要】 长春环城高速公路南段桥主梁在施工时发生梁体缺陷,加固补强后对其进行静载试验.通过对其各项工作性能指标进行综合分析,结果表明,该主梁加固补强后能够正常工作,从而,为该类桥梁的修复加固积累了一些经验.

【Abstract】 The girder of the south bridge of Changchun city highway was strengthed and tested for statical load owing to defects found in the beams.It was shown from integrated performance index analysis of the beam that the strengthed beam can work normally,which can provide references for the strengthening of this type of bridges.

  • 【文献出处】 吉林建筑工程学院学报 ,Journal of Jilin Architectural and Civil Engineering Institute , 编辑部邮箱 ,2006年02期
  • 【分类号】U446.1
  • 【下载频次】19
节点文献中: 

本文链接的文献网络图示:

本文的引文网络