节点文献

确定流水步距的新方法

New Method to Calculate Step of Continuous Construction

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 黄明马侠高公略

【Author】 HUANG Ming1, MA Xia2, GAO Gong-lve1 ( 1. Department of Civil Engineering, Huaihai Institute of Technology, Lianyungang 222005, China; 2. Lianyungang Linhong Construction Corporation, Lianyungang 222000, China )

【机构】 淮海工学院土木工程系连云港临洪建设工程有限公司淮海工学院土木工程系 江苏连云港222005江苏连云港222000江苏连云港222005

【摘要】 组织无节奏流水的关键是确定流水步距,传统的方法以潘特考夫斯基法最为常见。它是从整体出发求流水步距,不易理解。文章提出来的新方法着重从局部出发来求流水步距,先假定一个流水步距,然后再调整、确定,易于理解。

【Abstract】 It is essential to calculate step in continuous construction. Traditional method usually is difficult to accepted, which calculates step of continuous construction as a whole. A new method to calculate step of continuous construction is put forward, with which the step of continuous construction is calculated as a part and the step length is assumed firstly and adjusted latterly.

  • 【文献出处】 建筑管理现代化 ,Construction Management Modernization , 编辑部邮箱 ,2006年03期
  • 【分类号】TU721.3
  • 【下载频次】89
节点文献中: 

本文链接的文献网络图示:

本文的引文网络