节点文献

稳定过湿土作路基填料的试验研究

EXPERIMENTAL RESEARCH ON TAKING STABILIZED OVERWETTED SOIL AS ROADBED FILLER

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 张大捷田晓峰侯浩波刘浩谭石康

【Author】 Zhang Dajie Tian Xiaofeng Hou Haobo(Department of Evironmental Engineering,School of Resource and Environmental Science,Wuhan University Wuhan 430079)Liu Hao(Hubei Provincial Communication Planning and Design Institute Wuhan 430020)Tan Shikang(Hubei Suiyue Expressway Headquarters Tianmen 441300)

【机构】 武汉大学资源与环境科学学院环境工程系湖北交通规划设计院湖北随岳中高速公路指挥部 武汉430079武汉430079武汉430020天门441300

【摘要】 将HAS土壤固化剂按3%、4%的比例掺入过湿土,并测试了稳定土的击实、CBR、无侧限抗压强度等力学指标。结果表明,稳定后的过湿土,其力学性能完全达到路基填料的要求,此外结合XRD分析,对HAS固化剂稳定过湿土的化学机理进行探讨。

【Abstract】 Overwetted soil is mixed with 3%,4% by HAS soil stabilizer,mechanical indexes of stabilized soil such as,the compaction,CBR and unconfined compressive strength were measured.Results show that the mechanical behaviors of stabilized overwetted soil meet completely the requirements of filling materials in road bed.Besides,the chemical mechanism of stabilized overwetted soil by HAS stabilizer was explored with the XRD analysis.

【基金】 湖北省交通厅科技项目(编号:鄂交通科技(2003)570)
  • 【文献出处】 工业建筑 ,Industrial Construction , 编辑部邮箱 ,2006年07期
  • 【分类号】U416.1
  • 【被引频次】3
  • 【下载频次】102
节点文献中: 

本文链接的文献网络图示:

本文的引文网络