节点文献
金沙江梯级水电站发电长期优化调度研究
Study on Long-term Optimal Operation of Cascade Hydropower Plants on The Jinshajiang River
【摘要】 本文以金沙江干流梯级水电站为研究对象,建立了金沙江梯级水电站兼顾保证出力要求的以发电量最大为目标的单库优化联合调度和梯级优化联合调度2种长期优化调度模型,利用动态规划和逐次逼近动态规划方法求解,结果显示考虑上下游水力联系和电力补偿的梯级优化联合调度的效果更好。
【Abstract】 Taking cascade hydropower Stations in the Jinshajiang river as a study object,this paper establishes the maximizing long-term power generation united operation and optimal operation model of Jinshajiang cascade hydropower plants.The maximizing long-term power generation united operation and optimal operation model of the Jinshajiang cascade hydropower plants are set up.The former is solved by DP and the later by DPSA.The results show that the latter is more practical.
【关键词】 梯级水电站;
发电长期优化调度;
逐次逼近动态规划法;
金沙江;
【Key words】 cascade hydropower station; Long-term optimal dispatching in electricity generation; dynamic programming with successive approximation; Jinshajiang River;
【Key words】 cascade hydropower station; Long-term optimal dispatching in electricity generation; dynamic programming with successive approximation; Jinshajiang River;
【基金】 国家973项目课题“水沙过程变异与河流系统相互作用”(2003CB415203)
- 【文献出处】 贵州水力发电 ,Guizhou Water Power , 编辑部邮箱 ,2006年06期
- 【分类号】TV697.12
- 【被引频次】5
- 【下载频次】247