大跨度分步施工石拱桥仿真分析
Simulation analysis of the long span stone arch bridge of constructing by fractional steps
【摘要】 大跨度分步施工石拱桥 ,由于受到结构组成时序的影响 ,结构各部位的应力与变位随时都在发生变化 ;通过对世界最大跨径石拱桥——丹河大桥的施工仿真研究 ,找到了分步施工石拱桥施工仿真控制及分析方法 ,发现了拱脚高应力区
【Abstract】 Because the method of long span fractional steps of constructing the stone arch bridge is affected by the time sequencing of forming the structure,the stress and the displacement among the structure change at any time.In this paper,the construction simulation of Danhe bridge is studied,which is the longest span stone arch bridge in the world,the construction simulation control and method of fractional steps of constructing the stone arch bridge are found,at the same time,the high stress area in arch toe is discovered.
【关键词】 石拱桥;
分步施工;
仿真分析;
【Key words】 stone arch bridge; fractional steps construction; simulation analysis;
【Key words】 stone arch bridge; fractional steps construction; simulation analysis;
- 【文献出处】 中国公路学报 ,China Journal of Highway and Transport , 编辑部邮箱 ,2002年04期
- 【分类号】U448.22
- 【被引频次】17
- 【下载频次】188