节点文献
基于运价波动的铁路建设项目经济风险后评价
Economic risk post evaluation for railway construction project based on frustration of transport price
【摘要】 针对铁路运价波动及优质优价客、货列车比例的不断增加 ,描述了铁路客、货运收入率的波动过程 ,建立了铁路建设项目经济后评价的随机风险模型 ,借助模拟技术 ,以某一铁路建设项目为对象计算了各种经济后评价随机指标 ,为客观地进行铁路建设项目经济风险后评价提供了新方法
【Abstract】 Aimed at the fluctuating of transport price and the continuously increasing proportion of passenger or cargo trains which provide high quality & low price service, this paper describes the fluctuating process of the passenger traffic rate and cargo freight rate in railway respectively. It establishes the stochastic risk model of economic post evaluation of railway construction project. With the help of computer simulated technology, all kinds of economic post evaluation stochastic indexes of a railway construction project are proposed, which provides a new method to post evaluate objectively the economic risk for railway construction project.
【Key words】 railway; passenger traffic rate; cargo freight rate; stochastic model; economic risk; post evaluation;
- 【文献出处】 铁道学报 ,Journal of The China Railway Society , 编辑部邮箱 ,2002年06期
- 【分类号】F530
- 【被引频次】30
- 【下载频次】226