节点文献
编组站通过能力和改编能力模拟计算系统的研究
A simulation system for computing the carrying capacity and resorting capacity of marshalling station
【摘要】 利用计算机模拟法计算编组站通过能力和改编能力的一般方法,包括到达流的生成、编组站技术作业过程的模拟模型和车站最终能力的确定等三个方面。在此基础上,设计开发了编组站通过能力和改编能力模拟计算系统,并以郑州北编组站为背景,对在列车到发不均衡条件下编组站通过能力和改编能力的适应性进行模拟实验,获得一些有价值的研究结论。
【Abstract】 This paper presents a general method to compute the carrying capacity and resorting capacity of marshalling station by computer simulation, which includes the generation of train flows, the simulation model of marshalling station operation process and the determination of station integrated carrying capacity. Based on this method, the simulation system for computing carrying capacity and resorting capacity of marshalling station is designed and developed. Taking Zhengzhou North Marshalling Station as an example, some simulation experiments upon the adaptability of station carrying capacity and resorting capacity under the condition of unbalanced train arrivals/departures are made and several valuable conclusions are obtained.
【Key words】 marshalling station; carrying capacity; resorting capacity; simulation;
- 【文献出处】 铁道学报 ,Journal of The China Railway Society , 编辑部邮箱 ,2002年05期
- 【分类号】U291.412
- 【被引频次】49
- 【下载频次】560