节点文献

万年闸枢纽船闸工程施工期排水

Drainage During Construction Period of Wannianzha Junction Shiplock Engineering

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 万建忠张恒一杨锡显

【Author】 WAN Jian-zhong, ZHANG Heng-yi, YANG Xi-xian (Shangdong Provincial Port Construction Company, Qingdao 266032, China)

【机构】 山东省筑港总公司山东省筑港总公司 山东青岛266032山东青岛266032山东青岛266032

【摘要】 对万年闸枢纽工程在施工期间为保证正常干地施工采取的深层深井排水、浅层明沟排水相结合的排水方案进行了论述 ,包括地质水文状况分析、排水方案的设计、深井施工及抽水试验、深井排水系统对基坑突涌的评价等

【Abstract】 It gives an introduction to the drainage scheme of combining deep well dewatering in deep stratum with open ditch drainage in shallow layer during construction period of Wannianzha Junction engineering, including geologic & hydrograpic regime analysis, drainage scheme design, deep well construction and pumping test, as well as deep well drainage system’s evaluation of foundation ditch sudden surging, etc. Wannianzha Shiplock Junction Engineering during construction period

【关键词】 孔隙潜水突涌渗流干地施工
【Key words】 hole groundwatersudden wellingseepagedry construction
  • 【文献出处】 水运工程 ,Port & Waterway Engineering , 编辑部邮箱 ,2002年11期
  • 【分类号】U641.5
  • 【被引频次】1
  • 【下载频次】53
节点文献中: 

本文链接的文献网络图示:

本文的引文网络