节点文献
军山大桥钢箱梁除湿系统
Dehumidification System inside Steel Box Girders of Junshan Changjiang River Bridge
【摘要】 军山长江大桥主桥为主跨 4 6 0m的 5孔连续钢箱梁斜拉桥 ,其钢箱梁采用综合防腐技术。介绍钢箱梁内部作为防腐措施之一的除湿系统的工作原理、设计和安装。
【Abstract】 Junshang Changjiang River Bridge is a cable stayed bridge with 5 span continuous steel box girder, and its main span is 460 m, steel box girders are protected by synthetic preservation technology. Working principle, design and installation of dehumidification system as one of preservation methods are introduced.
【关键词】 斜拉桥;
钢箱梁;
除湿;
防腐;
【Key words】 cable stayed bridge; steel box girder; dehumidification; preservation;
【Key words】 cable stayed bridge; steel box girder; dehumidification; preservation;
- 【文献出处】 桥梁建设 ,Bridge Construction , 编辑部邮箱 ,2002年01期
- 【分类号】U443.5
- 【被引频次】3
- 【下载频次】178