节点文献

铅锌矿选矿工艺流程改造试验

Tests on Pb -Zn Ore Flotation Flowsheet Improvemet in Pb -Zn Mine

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 刘艳飞; 郭亮明; 刘宝山;

【Author】 LIU Yan -fei1,GUO Liang -ming2,LIU Bao -shan2 (1.Changsha Research and Engineerin g Institute of Nonferrous Metallurg y,Changsha 410007,China;2.Northwest Mining -Metallurgy Research Institute,Baiying 730900,China)

【机构】 长沙有色冶金设计研究院; 西北矿冶研究院; 西北矿冶研究院 湖南长沙410011; 甘肃白银730900; 甘肃白银730900;

【摘要】 针对五台山铅锌矿矿石难选、技术经济指标不理想的现状,本研究课题通过小型试验及工业试验,添加调整剂T6与捕收剂D3及现场一系列的改造,使铅、锌及其伴生金、银的精矿品位和回收率均有较大的提高,年新增经济效益206.67万元。

【Abstract】 In view of refractory Pb -Zn ore and u nsatisfactory tech -economic index in shanxi wutaishan Pb -Zn mine,bench -scale and commercial -s cale tests are made on Pb -Zn ore in the mine,The grade and recovery of lead,zinc and associated Au,Ag concentrates are greatly improved with a nnual economic returns increased by RMB2.6067million through addition of T6modifier and D3collector as well as a series of On -Site improvements.

  • 【文献出处】 湖南有色金属 ,Hunan Nonferrous Metals , 编辑部邮箱 ,2002年03期
  • 【分类号】TD952
  • 【被引频次】5
  • 【下载频次】113
节点文献中: 

本文链接的文献网络图示:

本文的引文网络