节点文献
铅锌矿选矿工艺流程改造试验
Tests on Pb -Zn Ore Flotation Flowsheet Improvemet in Pb -Zn Mine
【摘要】 针对五台山铅锌矿矿石难选、技术经济指标不理想的现状,本研究课题通过小型试验及工业试验,添加调整剂T6与捕收剂D3及现场一系列的改造,使铅、锌及其伴生金、银的精矿品位和回收率均有较大的提高,年新增经济效益206.67万元。
【Abstract】 In view of refractory Pb -Zn ore and u nsatisfactory tech -economic index in shanxi wutaishan Pb -Zn mine,bench -scale and commercial -s cale tests are made on Pb -Zn ore in the mine,The grade and recovery of lead,zinc and associated Au,Ag concentrates are greatly improved with a nnual economic returns increased by RMB2.6067million through addition of T6modifier and D3collector as well as a series of On -Site improvements.
- 【文献出处】 湖南有色金属 ,Hunan Nonferrous Metals , 编辑部邮箱 ,2002年03期
- 【分类号】TD952
- 【被引频次】5
- 【下载频次】113