大亚湾核电站18个月换料工程及其项目管理
18-Months Fuel Cycle Engineering and Its Project Management of the Daya Bay Nuclear Power Station
【摘要】 介绍了大亚湾核电厂在实施18个月换料改造中涉及到的各个方面,包括工程方案的确定、承包商的选定、项目的分解及实施情况、项目管理及风险控制方面的经验等等。并介绍了通过该项目成功实施技术引进,促进了长周期换料工程设计技术自主化和AFA 3G核燃料制造国产化。
【Abstract】 This thesis introduces aspects related to the performing of 18-months fuel cycle engineering evaluation to the Daya Bay nuclear power plant, including the assessment on proposed technical solutions, appointment to the contractors, breaking down and implementation of project, experience on the project management and risk control, and etc. And it also briefs the prompting to the localization of the long fuel cycle engineering technology and AFA 3G fuel manufacturing and design technology via adequate technology transferring of this project. (下转第17页)
【关键词】 18个月换料;
项目管理;
技术引进;
【Key words】 Months fuel cycle; Project management; Technology transferring.;
【Key words】 Months fuel cycle; Project management; Technology transferring.;
- 【文献出处】 核动力工程 ,Nuclear Power Engineering , 编辑部邮箱 ,2002年05期