节点文献
开封火电厂技改工程静压预制桩基础问题分析
Study on treatment effect of the jack-up pile in Kaifeng Power Plant
【摘要】 以开封火电厂技改工程为例 ,根据现场检测结果 ,探讨了影响静压预制桩沉桩深度成因 ,分析了静压桩承载力的分布规律 .得出静压桩的沉桩深度和承载力与地基土的性状密切相关 .尽管桩端进入砂层深度较小 ,却可以在桩端平面附近良好土层的作用下提供较大的端阻力
【Abstract】 The causes affecting the depth of jack up pile and the law of distribution of bearing capacity, taking Kaifeng Power Plant , Henan Province as study case, are studied based on in situ tests. The results indicate that pile depth and their bearing capacity are affected by the property of foundation soil. In the case study, though the depth of pile is smaller than that of design, the bearing capacity is enough to satisfy the need of construction.
- 【文献出处】 华北水利水电学院学报 ,Journal of North China Institute of Water Conservancy and Hydroelectric Power , 编辑部邮箱 ,2002年02期
- 【分类号】TU473.1
- 【下载频次】32