芭蕉河二级水电站引水建筑物优化设计
Optimized Design of Diversion Structures of Bajiao River-Ⅱ Hydropower Station
【摘要】 针对芭蕉河二级水电站的水文地质、工程地质条件和工程运用特点,通过技术经济论证,在调整隧洞轴线的基础上,采用以喷混凝土支护为主的多种隧洞衬砌处理形式,节省了工程投资,缩短了工期,其可行性、合理性和经济性在实践中得到了验证。
【Abstract】 Considering the peculiarities of geologic and hydrogeologic conditions and the operating requirement of the diversion works, the longitudinal axis of the power tunnel is adjusted, and the shotcrete lining is put to use, so the expenses and the construction period are cut down.
【关键词】 芭蕉河二级水电站;
引水建筑物;
优化设计;
洞线布置;
喷锚支护;
【Key words】 Bajiao River Ⅱ Hydropower Station; diversion structure; optimized design; alignment of tunnel axis; shotcrete lining;
【Key words】 Bajiao River Ⅱ Hydropower Station; diversion structure; optimized design; alignment of tunnel axis; shotcrete lining;
- 【文献出处】 湖北水力发电 ,Hubei Watero Power , 编辑部邮箱 ,2002年S1期
- 【分类号】TV732
- 【被引频次】1
- 【下载频次】48