【摘要】 在锅炉炉膛的狭窄空间里 ,利用卸车架将锅炉水冷壁底部组件卸车并吊装就位是一种创新的吊装工艺 ,既经济合理、方便快捷 ,又安全可靠 ,缩短了工期 .以沙角C电厂锅炉水冷壁底部组件吊装为例 ,阐述了这种大型火力发电厂锅炉水冷壁底部组件的安装方法

【Abstract】 It is a new hoisting technology to use the frame for unloading to unload and hoist the water wall bottom assembly in the narrow stove of the boiler. It is economical, reasonable, convenient, safe, reliable and can cut down the installation time limit.It is an example for the boiler’s water wall bottom assembly hoisting of the Shajiao C Power Station, to expound the method of large-size power station boiler’s water wall bottom assembly installation.

【关键词】 大型设备发电厂吊装
【Key words】 Large-size equipmentpower stationhoisting