节点文献

里石门水电站整铸转轮铸造工艺研究

Study on Foundry Technology of Integral Cast Runner for Lishimen Water Power Station

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 李凤玉徐卫红

【Author】 LI Feng-yu, XU Wei-hong(Harbin Electric Machinery Company Limited,Harbin 150040, China)

【机构】 哈尔滨电机厂有限责任公司哈尔滨电机厂有限责任公司 黑龙江哈尔滨150040黑龙江哈尔滨150040

【摘要】 里石门水电站不锈钢整铸转轮尺寸小、叶片簿、叶片间隙小 ,整体结构不利于铸件的顺序凝固和补缩。通过采用合理的铸造工艺,确保了其叶片型线尺寸精度、转轮表面质量及铸件内部的致密度满足了设计要求。

【Abstract】 The technique of stainless steel integral cast runner for Lishimen water power station is presented in this paper.Its dimensions are small,the thickness and clearance of blade are also small,therefor, the integral structure bring difficultes to progressive solidification and feeding constriction.By adopting appropriate foundry techniques,the accuracy of dimension and shape were ensured.The surface quality and in-ternal density of runner meet the requirements of design.

  • 【文献出处】 大电机技术 ,Large Electric Machine and Hydraulic Turbine , 编辑部邮箱 ,2002年04期
  • 【分类号】TG269
  • 【下载频次】72
节点文献中: 

本文链接的文献网络图示:

本文的引文网络