巴罗塔项目管理中的成本控制
Cost Control Management Applied for Ghazi Barotha Hydropower Project Contract C03
【摘要】 以中国东方电气集团公司所承建的第 1个严格按FIDIC土建合同条款进行施工管理的巴基斯坦“嘎兹 -巴罗塔水电工程第C0 3标———厂房及附属建筑工程”为基本素材 ,结合项目中所采用的成本控制管理系统在工程近 5年施工中的数据和各案例的经验积累 ,系统总结了成本控制的理论概要、数据结构模式、控制指标设定和分析决策方法等 4个关键构成要素在大型施工管理中的有效解决方法和方案 (Solutions) ,并在此基础上阐述了成本控制对项目管理效益的重要意义
【Abstract】 The Ghazi Barotha Hydropower Project Contract C03 for the construction of civil works of Power Complex and Ancillary was awarded to the Dongfang Electric Corporation in December 1996 and being executed by the same for nearly five years.The terms and conditions of the Contract are based on the standard form published by FIDIC as the 4th Edition for Works of Civil Engineering Construction with editorial amendments.prepared in accordance with the related field material including records,data,cases and whatsoever particulars which were collected and accumulated during the construction period of the Project.Together with the writers experience obtained from the past and the project,the paper presents major instances of the cost control management which was the first time applied by the DEC in such mega project in full cost elements.These instances include Principle of Cost Control.Data Structure,Control Indicator/Criteria and Decision Making,according to which summarizes the most effective and useful "Solutions" for each instance,and addresses the importance of the cost control management for the project.
- 【文献出处】 东方电气评论 ,Dongfang Electric Review , 编辑部邮箱 ,2002年02期
- 【分类号】F416.91
- 【被引频次】2
- 【下载频次】100