节点文献

飞来峡水电厂计算机监控系统的投运经验

THE EXPERIENCE FROM OPERATION OF THE COMPUTER SUPERVISORY AND CONTROL SYSTEM AT FEILAIXIA HYDRAULIC POWER PLANT

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 许德荣

【Author】 Xu Derong(Feilaixia Water Conservancy Management Bureau of Guangdong Province, Qingyuan 511825, China)

【机构】 广东省飞来峡水利枢纽管理局 广东省清远市511825

【摘要】 简要介绍了飞来峡水电厂计算机监控系统的配置和运行状况 ;着重介绍了该系统从投入运行至今所发现的系统原设计中的缺陷 ,包括 UPS容量不足、带负荷拉隔离刀闸、母线配置不当、机旁屏内模块发热等 ,以及系统投运中由于偶然因素和模块损坏导致的故障 ;阐述了相应的改进和处理方法

【Abstract】 This paper briefly introduces the configuration and operation status of the computer supervisory and control system at Feilaixia Hydraulic Power Plant. It mainly describes the defects in the original design which have been found since the system was put into operation, including the insufficiency of UPS capacity, on-load operation of the isolator, improper bus-bar configuration, overheat of modules in the cubicle, and so on, as well as faults caused by incidental factors and damage of modules. It also expounds their corresponding treatment and improvement methods.

  • 【文献出处】 水电自动化与大坝监测 ,Dam Observation and Geotechnical Tests , 编辑部邮箱 ,2002年05期
  • 【分类号】TV736
  • 【下载频次】28
节点文献中: 

本文链接的文献网络图示:

本文的引文网络