节点文献

无间柱连续采矿法矿段回采的地压规律与控制技术

Ground pressure and control techniques in non-pillar continuous mining method

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 邓建; 李夕兵; 古德生;

【Author】 DENG Jian 1, LI Xi bing 2, GU De sheng 2 (1.Department of Geotechnical Engineering, Tongji University, Shanghai 200092, P.R.China; 2. College of Resource, Environment and Civil Engineering, Central South University, Changsha 410083, P.R.Ch

【机构】 同济大学地下建筑与工程系!上海200092; 中南大学资源环境与建筑工程学院!长沙410083;

【摘要】 以某铜金属矿山为例 ,简介无间柱连续采矿法的技术思路和具体方案。运用能模拟开挖与充填的三维有限单元法程序 ,对无间柱连续采矿法矿段回采的实际采矿过程进行数值分析 ,得出了无间柱连续采矿法的地压活动规律 ,提出相应的地压控制措施 ,为无间柱连续采矿法在试验矿山的应用和推广提供了依据

【Abstract】 There is a general tendency to use continuous mining in underground metal mine. Non pillar continuous mining(NPCM) was briefly introduced as an example of a new continuous mining method in a copper mine. Its technological concept and its excavation plan were outlined. Three dimensional finite element numerical method was employed to simulate the practical excavation and backfilling mining activities. Stability status (including stress and displacement) was analyzed and proper measures to control the ground pressure were presented. These measures are as follows: 1) attention to manage the stope’s roof should be focused on the roof near the hanging wall; 2) the strength and stiffness of backfilling in the lower part of stope should be greater than that of backfilling in the upper part; 3) there exists localized stress concentration in the temporary pillar and temporary ore wall during the whole process of excavation; 4) control blast technique should be employed to excavate the temporary ore wall and the ore body near the temporary ore wall.

【基金】 国家“九五”科技攻关计划资助项目( 95 -116-0 1-0 1-0 3)
  • 【文献出处】 中国有色金属学报 ,The Chinese Journal of Nonferrous Metals , 编辑部邮箱 ,2001年04期
  • 【分类号】TD853
  • 【被引频次】27
  • 【下载频次】300
节点文献中: 

本文链接的文献网络图示:

本文的引文网络