节点文献
塔梁联结对斜拉桥主梁施工的影响
How Pylon-girder Connection Affects Construction of Main Girder in Cable-stayed Bridges?
【摘要】 本文以宕石大桥为例,分析了塔梁联结方式的不同对主梁边跨合拢前后结构影响的差异,并与施工实测结果进行了对比、验证,仅供参考.
【Abstract】 Taking Dangshi Bridge for example, analysis is made of the influence of different forms of pylon-girder connection on the structure before and after the main girder side spans are joined, including comparison and verification With the in-situ measurement during construction.
- 【文献出处】 中国市政工程 ,China Municipal Engineering , 编辑部邮箱 ,2001年01期
- 【分类号】U448.27
- 【被引频次】1
- 【下载频次】33