节点文献

廖坊水利枢纽工程浸没范围研究

Study on immersion area of the Liaofang hydranlic engineering project

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【摘要】 廖坊水利枢纽是抚河流域规划中的开发项目。为了确保农田继续耕种 ,本文对廖坊水利枢纽工程的浸没范围进行了研究 ,并提出在堤基和堤身内设置防渗墙 ,在城区和农田内设置排水沟 ,城市供水和农田灌溉采用地下水源 ,并对防渗墙的厚度和渗透性进行了预测

【Abstract】 The Liaofang hydro-junction is the development item in program of Fuhe River valley.After the project will have been completed,ten thousands of acres fine farm will have been immersed.In order to continue the farm cultivated,Authors study the immersion range of the farm,and raise setting up impervious wall in the embankment base and the embankment body,putting up drainage ditech in the city and the farm,and using groundwater resource in municipal and farm water supply.The thick and the permeability of the impervious wall are forecasted.

【关键词】 浸没防渗墙水利枢纽工程廖坊
【Key words】 immersionimpervious wallhydro-junction projectLiaofang
  • 【文献出处】 水文地质工程地质 ,Hydrogeology and Engineering Geology , 编辑部邮箱 ,2001年06期
  • 【分类号】TV632
  • 【被引频次】1
  • 【下载频次】64
节点文献中: 

本文链接的文献网络图示:

本文的引文网络