节点文献

地下工程中基坑开挖施工三维非线性时变计算分析

The Nonlinear Time-Varying Mechanics Analyses of Three-DimensionalExcavation in the Underground Engineering

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 梁岗曹志远徐旭

【Author】 LIANG Gang 1, CAO Zhi-yuan 1, XU Xu 2 (1.Department of Engineering Mechanics and Technology, Tonji University, Shanghai 200092, China; 2. Presidential Office, Shanghai University, Shanghai 200436, China)

【机构】 同济大学工程力学与技术系!上海200092上海大学校长办公室!上海200436

【摘要】 运用时变固体力学的分析方法 ,建立了地下基坑开挖增量型边值问题的基本方程 ,并对三维基坑开挖问题进行了非线性时变力学计算分析 .根据计算结果 ,分别考察了基坑开挖问题的过程相关性、空间相关性对基坑开挖计算的影响 ,并得出了一些有益的结论 .

【Abstract】 The method of time-varying mechanics is used to set up a series of basic equations of the incremental model of excavation in the underground engineering. Moreover, the nonlinear computation of three-dimensional excavation problem is carried out. According to the results, the effects of relevance of procedure and dimensions are discussed respectively, and some beneficial conclusions are obtained.

【基金】 国家自然科学基金!项目 (5 97780 0 1) ;国家教委固体力学开放研究实验室资助
  • 【文献出处】 上海大学学报(自然科学版) ,Journal of Shanghai University(Natural Science Edition) , 编辑部邮箱 ,2001年02期
  • 【分类号】TU753.1
  • 【被引频次】26
  • 【下载频次】147
节点文献中: 

本文链接的文献网络图示:

本文的引文网络