节点文献

高层后张预应力框架梁施工技术控制

The Prestressed Construction Technology Control of Frame Girder in High-rise Building

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 李岐山金勇

【Author】 LI Qi Shan,JIN Yong (Luoyang Archit. Eng. Co., Luoyang,471000,China)

【机构】 洛阳市建筑工程公司洛阳市建筑工程公司 河南洛阳471000河南洛阳471000

【摘要】 分析预应力张拉模式及等效荷载对框架结构的内力影响 ,非预应力筋的设计问题、预应力筋穿设及砼浇注阶段注意问题、工程施工中张拉控制方法及预应力损失施工计算分析 ,预应力的测试结果及张拉参数调整。高层结构预应力的理论计算与其实际预应力建立值受力状态间有一定的偏差 ,只有结合测试搞好复杂部位预应力分析 ,才能搞好预应力施工技术控制。

【Abstract】 A number of aspects are analyzed in this paper,which include the inner force influence of the frame structure caused by stretching mode,equivalent loads,the problems with non prestressed bar design,and with the strand being laid and prestressed concrete being poured.The tensioning way and the loss of prestress with the frame girder are studied.Tensioning stress is adjusted according to the stretching test data with the frame girder.There is a deviation on expected and measured stress values during the stretching of prestressed bar.Testing and analyzing stress distribution of the frame structure complex spot can keep the prestressed construction technology in good control.

【基金】 河南省建筑业新技术推广应用科技示范工程项目
  • 【文献出处】 洛阳工学院学报 ,Journal of Luoyang Institute of Technology , 编辑部邮箱 ,2001年04期
  • 【分类号】TU757.14
  • 【被引频次】1
  • 【下载频次】26
节点文献中: 

本文链接的文献网络图示:

本文的引文网络