安钢“高线”在技改实施阶段的质量控制与管理
QUALITY CONTROL AND MANAGEMENT DURING TECHNICAL TRANSFORM ENFORCEMENT TERM IN ANGANG "HIGH-SPEED ROD PLANT
【摘要】 通过安钢线材易地改造工程的实施,详细介绍了成套关键设备引进与国内配套自制相结合的技改项目在技改实施阶段的质量控制及管理方法,过程具体、重点突出、措施得力、效果显著。
【Abstract】 The paper discribes in detail the quality control and management method during technical enforcement term of imported set of key equipment combined domestic equiped self -manufactured equipment through Carrying out of Angang rod mill project. It has some characters such as detail process,key points-stand out,measures efficently and be very effective.
【关键词】 高线;
配套;
技改;
质量控制;
【Key words】 High-Speed rod equiped technical transformation quality control;